Hi Brobel, Great work! Thanks. Here's what I could source on the Lockyer Deep-1 drill time vs. depth graphic. Of course, Lockyer Deep-1 had all those BOP issues at the 13-3/8'' casing point which delayed things significantly. Barring any operational delays at Lockyer -2, the well should be preparing to drill out the 9-5/8'' casing shoe and then into the Dongara/Wagina Formations, or if things are progressing even better, drilling towards the Kingia Formation core point. Good luck all. Kind regards OldGeo
NWE Price at posting:
6.1¢ Sentiment: Buy Disclosure: Held