With an extensive drilling programme beginning this month (September 2015) at the established target at Whitehall I'd be expecting to hear some drilling results over the coming months.
Any thoughts on an expected time line before we start hearing results from the drilling programme?
Add to My Watchlist
What is My Watchlist?