34 day drill time to TD 3100m is roughly 90m day.
18 days since spudding, to be back on track to meet that timeframe it should be around 1600m, hypothetically!
but that implies since the 400m mark, it would of had to of drilled 1200m in past 7 days calculates to 170m/day plus casing probably.
Casing depths are usually determined during well design so with a chart and hopefully more detailed announcement we won't need to guess/worry next time.
- Forums
- ASX - By Stock
- drilling
34 day drill time to TD 3100m is roughly 90m day.18 days since...
-
- There are more pages in this discussion • 6 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add JPR (ASX) to my watchlist
(20min delay)
|
|||||
Last
2.6¢ |
Change
0.000(0.00%) |
Mkt cap ! $33.11M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 3486 | 2.6¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
3.0¢ | 28604 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 3486 | 0.026 |
2 | 300000 | 0.025 |
2 | 92883 | 0.022 |
2 | 500000 | 0.020 |
1 | 3056 | 0.016 |
Price($) | Vol. | No. |
---|---|---|
0.030 | 28604 | 1 |
0.032 | 100000 | 1 |
0.035 | 34117 | 1 |
0.036 | 40000 | 1 |
0.039 | 580000 | 1 |
Last trade - 16.11pm 16/07/2024 (20 minute delay) ? |
Featured News
JPR (ASX) Chart |
Day chart unavailable