3 holes too be drilled started 12 feb and this programme is for...

  1. 23,631 Posts.
    lightbulb Created with Sketch. 354
    3 holes too be drilled started 12 feb and this programme is for five weeks ,so i reckon about 12 days per hole,so about 2/3 the way down the first hole,drilling depth 580-700 meters per hole,and unless they ann visuals and we have to wait for assays could be up to two to three months before any results ,they have the drill rig till july so once theses three are done its off to other hot areas,i hold and hope, hope all this helps only my take on it, and i am as dump as two white posts cheers
 