HDR hardman resources limited

drilling - ???????

  1. 8,880 Posts.
    It must be getting close to a result at Pourne, the well was spudded on the 16th and a report on the 18th stated that they were at 1709m and running the casing.
    Total depth of this well is 3250m, [water 950m] so with and extra 6-7 days it should be through the Miocene secondary target and depending on delays for testing etc at this level it could be at the start of the Cretaceous target.
    Any other theories?
 
watchlist Created with Sketch. Add HDR (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.