It must be getting close to a result at Pourne, the well was spudded on the 16th and a report on the 18th stated that they were at 1709m and running the casing.
Total depth of this well is 3250m, [water 950m] so with and extra 6-7 days it should be through the Miocene secondary target and depending on delays for testing etc at this level it could be at the start of the Cretaceous target.
Any other theories?
- Forums
- ASX - By Stock
- HDR
- drilling - ???????
HDR
hardman resources limited
drilling - ???????
-
- There are more pages in this discussion • 35 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)