ASM australian strategic materials limited

Dubbo project now at assessment stage, page-6

  1. 3,793 Posts.
    lightbulb Created with Sketch. 694
    A bit of self education I thought I would share, although many here are already on top of this

    A quick summary of the product changes from Dubbo 2013 and the changes proposed by Dubbo 2022 currently being assessed by NSW planners;

    Dubbo 2013

    The products of 2013 below would seem to include Zirconia (ZrO2), ZBC (Zirconia Basic Carbonate), both Nb2O5 and FeNb, then a wide range of HREE and LREE products (concentrates or oxides?)

    https://hotcopper.com.au/data/attachments/4603/4603108-da9e2ec1d27562a136676193aac516aa.jpg

    Dubbo 2022

    There are substantial changes in the 2022 flowsheet - see below;

    • ZrO2 remains
    • No ZBC but further processing instead to produce higher value de-hafniated Zirconia (DHZ) and Hafnia (HfO2)
    • No more Nb2O5 but processing all into higher margin FeNb
    • A substantial reduction in range of HREE/LREE products
    • dropping Yttrium, Gadolinium, Europium, Lanthanum, Cerium and Samarium
    • to just leave Neodymium/Praesodymium (heading to KMP), Terbium and Dysprosium

    https://hotcopper.com.au/data/attachments/4603/4603129-3e4e0f5ef5ac23b4de08eb201df3218f.jpg
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
(20min delay)
Last
72.0¢
Change
0.000(0.00%)
Mkt cap ! $145.6M
Open High Low Value Volume
0.0¢ 0.0¢ 0.0¢ $0 0

Buyers (Bids)

No. Vol. Price($)
1 1388 72.0¢
 

Sellers (Offers)

Price($) Vol. No.
72.0¢ 12801 1
View Market Depth
Last trade - 07.35am 25/07/2025 (20 minute delay) ?
ASM (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.