Great read Johnny thanks ,
We are 100pc ready for oil .
The first gas show at the start of the surrounding area's producing formation .
Followed by an oil show of good quality .
No news on how much but it isn't the primary target anyway .
Further drilling to just above the main target and we have a continuous gas show .
Main target only 150ft away and already shows gas/oil and gas/? .
No water issues and , as gas is normally found above oil not water , the reservoir that has been seismically shown to be 150ft away should be full of oil not water !
OK a production tubing is in and tested allowing for the hole to be safely continued .
On time and on budget .
No problems .
We are 100pc ready for oil.
- Forums
- ASX - By Stock
- VIL
- dummies guide to vil
dummies guide to vil, page-47
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)