" You haven’t seen the policy, that doesn’t mean Dutton doesn’t have a policy developed, along with modelling and costings. "
You posted earlier today that they were still forming a policy.
So which is it ? He has a policy or he doesn't ?
" a policy developed, along with modelling and costings. "
Really ?
So he doesn't know how many or what type of reactors he will use . He doesn't know how much he will have to pay for the sites. He is still going to have a 80-90% renewable grid which isn't built yet which will require a whole bunch of poles and wires.