estimates vary widely MC. I used the $8Bn number as the least...

  1. 43,571 Posts.
    lightbulb Created with Sketch. 642
    estimates vary widely MC. I used the $8Bn number as the least amount likely to be paid for each averaged unit.

    both Brit and French nuclear plants under construction show delayed and cost blowouts. these can double the cost.
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.