He has stated that he would have to " negotiate " with the site...

  1. 36,230 Posts.
    lightbulb Created with Sketch. 4
    He has stated that he would have to " negotiate " with the site owners .

    That means he doesn't have a deal done. Therefore he doesn't know the cost.

    " He's forming a policy "

    So he doesn't have a policy then ? Thanks for confirming that . lf the policy isn't formed then that means he doesn't have all or any of the information required.

    " Electricity required " . The great thing about the renewable rollout is it's flexibility . lt is many times faster and cheaper to rollout than baseload . lt is also widely spread across the country so as the load evolves a renewable grid can evolve with it. The Dud plans to lock in these nuclear plants for 80 to 100 years . So he knows what Australia will look like and what its requirements will be next century ???

    lt is good to look at other countries experience for a basis but then we need to adapt that to the Australian circumstance . Just because someone does something OS doesn't mean it will work here. E.g. car manufacturing.

    The CSlRO report ? Does Dutton have better information ? Why didn't he share it ? The only people that are disputing the CSlRO are nuclear shills. What a surprise.

    The Dud's backflip ? The video has been posted on this forum several times over the last couple of days . lt's a matter of public record.

    He said he would release the numbers before the budget . He didn't . End of story.

    Another troll smashed and it's not even lunch time.
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.