energy storage that doesn’t current exist at the size and capacity required to provide reliable, scalable firming capability.
We would require 57 of the current worlds largest battery (moss landing) at a cost of $560M USD per site to provide the required 43GW of firming capacity Australia needs.
- Forums
- Political Debate
- Dutton endorses renewables
energy storage that doesn’t current exist at the size and...
-
- There are more pages in this discussion • 290 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)