DVP 2.11% $2.42 develop global limited

DVP Technical Analysis, page-2168

  1. 1,953 Posts.
    lightbulb Created with Sketch. 1139
    1) There is a shortage of raw materials, i.e. copper ore - lower grades, high cost, mine closures
    2) There is excess smelter capacity in China with more opening in India
    3) Demand for the metal is rising
    More smelter chasing the less available ore = high prices.
    4) But main reason is DVP not producing copper yet, which is exacerbating the situation
 
watchlist Created with Sketch. Add DVP (ASX) to my watchlist
(20min delay)
Last
$2.42
Change
0.050(2.11%)
Mkt cap ! $587.2M
Open High Low Value Volume
$2.37 $2.48 $2.37 $3.364M 1.387M

Buyers (Bids)

No. Vol. Price($)
1 745 $2.42
 

Sellers (Offers)

Price($) Vol. No.
$2.43 50000 1
View Market Depth
Last trade - 16.10pm 10/05/2024 (20 minute delay) ?
Last
$2.43
  Change
0.050 ( 3.08 %)
Open High Low Volume
$2.38 $2.48 $2.38 150027
Last updated 15.59pm 10/05/2024 ?
DVP (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.