Not sure where you obtained your figures from but the $75m to $100m does not seem to be much capital expenditure. CAI is spending $120m to develop a gold mine to produce 90koz pa at a grade a bit over 1gm/t which includes underground as well as open Pitt. They have a very good return at current ZpIG.
BGL cap ex is $255m (underground) to produce 150k oz pa with a grade of 8gn/t while GOR (open pit) spent nearly $600m to produce 300koz pa at a grade a bit about 1gm/t.
Capital expenditure and the economics of a mine depend on more than just grade - eg metal being mined, size of mine, annual production, type of rock, recovery %. underground vs open cut, etc.
Sorry to say but both these posts seem to be too simplistic.
- Forums
- ASX - By Stock
- AZS
- Economic grade comparison
Economic grade comparison, page-4
-
-
- There are more pages in this discussion • 106 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AZS (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
MTL
MANTLE MINERALS LIMITED
Nick Poll, Executive Director
Nick Poll
Executive Director
SPONSORED BY The Market Online