That really is poorly finished concrete and poorly cut expansion gap. If on university grounds to have such a poor non slip surface is poor form and stuffed surface drainage Looks lie it is min 80mm thick and probably 100mm on not prepared soil that was turfed
Not sure what contractor doesn't prevent vehicles and mowers driving on pedestrian paths by leaving forms and barriers in place but with the 100mm step up that is a vehicle on green concrete or large surface shrinkage from poor finishing and water in mix or wrong mix in high / low temperature environment
Like to see if the mesh is in the top , middle or bottom of that path or if they put any in and if it is really 25mpa for starters.
What were university and contractor thinking?? Lowest bidder?
Honestly even edencrete won't stop idiots doing a poor job or other idiots wrecking it.
- Forums
- ASX - By Stock
- EDE
- EdenCrete Media Thread
EdenCrete Media Thread, page-93
- There are more pages in this discussion • 1,526 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add EDE (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.3¢ |
Change
0.000(0.00%) |
Mkt cap ! $11.03M |
Open | High | Low | Value | Volume |
0.3¢ | 0.3¢ | 0.3¢ | $1 | 226 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
23 | 22492954 | 0.2¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.3¢ | 64579648 | 45 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
23 | 22492954 | 0.002 |
82 | 220470740 | 0.001 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.003 | 64579648 | 45 |
0.004 | 6987926 | 10 |
0.005 | 1679750 | 6 |
0.006 | 582510 | 5 |
0.007 | 1068831 | 3 |
Last trade - 10.02am 07/06/2024 (20 minute delay) ? |
Featured News
EDE (ASX) Chart |