OEL 7.69% 1.2¢ otto energy limited

edirne gas average 9.7m cu ft per day, page-3

  1. 30,163 Posts.
    lightbulb Created with Sketch. 646
    I'm sure Somurcali was supposed to be finished by now, maybe they were held up by the weather or equipment breakdown ? Anyway should find out soon, waiting on an email/call back on what the delay was ? FWIW tomorrows the
    beginning of the next positive according to the astro "tea leaves".
 
watchlist Created with Sketch. Add OEL (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.