The NS 377-3 field development well (Beach 20%) has intersected a 140 metre
gross oil column (20 metres greater than prognosed) in the Kareem Formation
reservoir and is being cased as a future oil producer. NS 377-3, the first
production well for the field, has been drilled from an onshore location to
intersect the offshore oil pool 150 metres north of the GH 377-1 discovery well.
Production from the 377 field is expected to commence into the Ras Ghara
facility, 7 km to the north west of the 377-3 well location, in early 2010
- Forums
- ASX - By Stock
- BPT
- egypt - at last!!
egypt - at last!!
-
- There are more pages in this discussion • 14 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add BPT (ASX) to my watchlist
(20min delay)
|
|||||
Last
$1.54 |
Change
-0.005(0.32%) |
Mkt cap ! $3.513B |
Open | High | Low | Value | Volume |
$1.56 | $1.57 | $1.54 | $6.973M | 4.508M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 23310 | $1.54 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$1.55 | 6252 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 23310 | 1.540 |
2 | 77399 | 1.535 |
3 | 62501 | 1.530 |
3 | 55603 | 1.525 |
7 | 35629 | 1.520 |
Price($) | Vol. | No. |
---|---|---|
1.545 | 3236 | 1 |
1.550 | 44561 | 2 |
1.555 | 31204 | 3 |
1.560 | 94626 | 3 |
1.565 | 39453 | 2 |
Last trade - 16.10pm 16/07/2024 (20 minute delay) ? |
Featured News
BPT (ASX) Chart |