BPT 0.49% $1.53 beach energy limited

The NS 377-3 field development well (Beach 20%) has intersected...

  1. 351 Posts.
    The NS 377-3 field development well (Beach 20%) has intersected a 140 metre
    gross oil column (20 metres greater than prognosed) in the Kareem Formation
    reservoir and is being cased as a future oil producer. NS 377-3, the first
    production well for the field, has been drilled from an onshore location to
    intersect the offshore oil pool 150 metres north of the GH 377-1 discovery well.
    Production from the 377 field is expected to commence into the Ras Ghara
    facility, 7 km to the north west of the 377-3 well location, in early 2010
 
watchlist Created with Sketch. Add BPT (ASX) to my watchlist
(20min delay)
Last
$1.53
Change
-0.008(0.49%)
Mkt cap ! $3.524B
Open High Low Value Volume
$1.55 $1.56 $1.53 $3.160M 2.051M

Buyers (Bids)

No. Vol. Price($)
65 159998 $1.53
 

Sellers (Offers)

Price($) Vol. No.
$1.54 166971 41
View Market Depth
Last trade - 13.11pm 17/07/2024 (20 minute delay) ?
BPT (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.