The NS 377-3 field development well (Beach 20%) has intersected a 140 metre
gross oil column (20 metres greater than prognosed) in the Kareem Formation
reservoir and is being cased as a future oil producer. NS 377-3, the first
production well for the field, has been drilled from an onshore location to
intersect the offshore oil pool 150 metres north of the GH 377-1 discovery well.
Production from the 377 field is expected to commence into the Ras Ghara
facility, 7 km to the north west of the 377-3 well location, in early 2010
- Forums
- ASX - By Stock
- egypt - at last!!
The NS 377-3 field development well (Beach 20%) has intersected...
-
- There are more pages in this discussion • 14 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add BPT (ASX) to my watchlist
|
|||||
Last
$1.53 |
Change
-0.008(0.49%) |
Mkt cap ! $3.524B |
Open | High | Low | Value | Volume |
$1.55 | $1.56 | $1.53 | $3.160M | 2.051M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
65 | 159998 | $1.53 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$1.54 | 166971 | 41 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
63 | 170380 | 1.530 |
22 | 154883 | 1.525 |
18 | 224847 | 1.520 |
11 | 225043 | 1.515 |
6 | 467415 | 1.510 |
Price($) | Vol. | No. |
---|---|---|
1.535 | 158936 | 38 |
1.540 | 167851 | 32 |
1.545 | 369690 | 24 |
1.550 | 246514 | 25 |
1.555 | 175251 | 15 |
Last trade - 13.11pm 17/07/2024 (20 minute delay) ? |
Featured News
BPT (ASX) Chart |