ETM 5.00% 2.1¢ energy transition minerals ltd

EIA Delay Update, page-4

  1. 149 Posts.
    lightbulb Created with Sketch. 28
    I talked to Damien Krebs ( Greenland Minerals ) and he stated that there were some points in the EIA that was submitted that need to be revised/clarified. This is being done now  with input from a global company and he anticipates that these revision will be submitted in January and that ML will likely be granted later in the year. 

    The panic and hysteria is probably related to the dis-information and hubris posted by anti-mining groups based on the original EIA draft. I decided to hold my position. It also problematic in that Greenland requires a much more in-depth EIA than most countries and that accounts for much of the delay.

 
watchlist Created with Sketch. Add ETM (ASX) to my watchlist
(20min delay)
Last
2.1¢
Change
0.001(5.00%)
Mkt cap ! $29.58M
Open High Low Value Volume
2.2¢ 2.2¢ 2.1¢ $8.365K 380.3K

Buyers (Bids)

No. Vol. Price($)
1 436371 2.1¢
 

Sellers (Offers)

Price($) Vol. No.
2.2¢ 1363 1
View Market Depth
Last trade - 14.52pm 06/09/2024 (20 minute delay) ?
ETM (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.