wouldnt it have been wiser, if one was going to build a battery knowing that a power station was shutting down, that one would have planned to build a battery in preparation for the power plant shutting down instead of planning to build a battery after the said power plant shut down?
seems a bit knee jerk to me and most likely fairy floss
- Forums
- Political Debate
- Eight hour big battery trumps pumped hydro in NSW long duration storage tender