Electricity must see, page-7

  1. 4,381 Posts.
    lightbulb Created with Sketch. 103
    Well Snowy was built to supply Canberra and for share between Vic and NSW.

    It was mainly used in the system for peak power and frequency control.

    I can't remember when it was used in that way we ever had a water shortage.

    Yes water is used for farming on the murray side of the mountains and still is, however much of it went to the Ocean at Marlo Vic.And a lot still does.

    We have not stopped the water flow we are making wise use of it to generate electricity.

    Go see the system works at Cooma NSW. Exelecent display center.
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.