Background gas come from the bit smashing up the rock in the hole and liberating the gas contained within which enters the mud, connection gas comes when the mud pumps are turned off to add a drill pipe reducing the pressure of the mud allowing gas to seep into the hole. the lack of spikes in the gas record tellls everyone except the most technically challenged that this Leadville is tight