you dont want to be caught with you pants down running out of stock.
By their ann of 2000 stores and now having major companies to back that figure up. Stores will at least get a set of 12 tubes.
So 30,000 - 40,000 tubes need to be manufactured. Could simply be a delay in manufacture that is keeping everything to a halt at the moment.
This initial manufacture is for the first month of sales, there needs to be a major buffer in product quantity which you can double - triple 40,000 tubes.
- Forums
- ASX - By Stock
- email to jp
you dont want to be caught with you pants down running out of...
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CAI (ASX) to my watchlist
(20min delay)
|
|||||
Last
11.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $93.67M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
CAI (ASX) Chart |
Day chart unavailable
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non--Executive Director
Simon Kidston
Non--Executive Director
SPONSORED BY The Market Online