CGN 0.00% 0.0¢ crater gold mining limited

'Initial target to reach 1,000 tonne/month at 30 g/t gold at a co...

  1. 887 Posts.
    lightbulb Created with Sketch. 16
    'Initial target to reach 1,000 tonne/month at 30 g/t gold at a cost of $500 per ounce.'

    If this can be achieved it will mean a gross profit of approx. $9m p/a.. That's roughly the current MC. Very cheap IMO
 
watchlist Created with Sketch. Add CGN (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.