HAR 0.00% 7.2¢ haranga resources limited.

• First RC drill assay results are expected in late March, along...

  1. 3,559 Posts.
    lightbulb Created with Sketch. 586
    • First RC drill assay results are expected in late March, along with the results from the
    metallurgical sample, which is also expected in March

    Initial drilling commenced at Saraya, with the aim to extend the existing inferred JORC
    resource of 16.1Mlb U3O8 @ 587ppm

    • On receipt of the metallurgical results, the Company also expects to release a revised
    JORC resource in April, then a further revised resource once all drill assays are received
    (anticipated for 2nd Quarter 2024)

    Wont stay at these levels much longer imo.
 
watchlist Created with Sketch. Add HAR (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.