Cozart 19 No 1 fracced in late 2012, producing oil & gas as at 21/12.
Robinson No 1 3,000ft 11th Dec, 8,500ft 21st Dec, (so would have finished drilling in 2012 easily). Finished drilling, still awaiting frac (16th Jan 2013)
Debnam 22 No 1 still awaiting frac
Some (or all) of the above will account for the prepayments.
Dec 2012 production was 27,955 BO 128,224 MCF or 1929 BOEPD
Wells drilled in 2013
SS 20% WI in 3 wells - Nova 33 No 1 frac by Aug) & Billie Jo 33 No 2 (frac 14/8), Nova 33 No 2 - spud 5/10, finished by 11/11