ReD_Duck... Actually there needs to be a fact check. Considering Songas are the operator of the pipeline and not the Owner of the wells that are producing they are two separate bodies (Belongs to another listed company, whose name I cannot currently recall)!
Songas are talking about installing a compressor which will allow more Gas to flow down the pipeline. There is also mention of duplication of the pipeline as well (been talk on both for a while).
However it is not the case of the owner who is doing the drilling being able to send solely their gas down the pipeline. At the moment all capacity is taken up, by them - yes. In the future with the above initiatives that should not be the case. We should be able to have a share in the gas flow leaving the island... Well our 5% share now!
- Forums
- ASX - By Stock
- enough is enough
ReD_Duck... Actually there needs to be a fact check. Considering...
-
- There are more pages in this discussion • 2 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add KEY (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.1¢ |
Change
0.000(0.00%) |
Mkt cap ! $2.262M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
KEY (ASX) Chart |
Day chart unavailable
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non--Executive Director
Simon Kidston
Non--Executive Director
SPONSORED BY The Market Online