EM2 7.41% 5.8¢ eagle mountain mining limited

Ann: Entitlement Offer Closes Raising $4.18 million, page-37

  1. 710 Posts.
    lightbulb Created with Sketch. 240

    Yep.

    EG Jubilee Metals: glycine leaching waste - aiming to produce 20,000 tpa Cu @<$4,000/t for $50m capex, 12 months to construct and commission


    · Jubilee secures one of the largest copper waste rock assets on surface in Zambia.

    · Estimated at more than 350 million tonnes of waste rock material on surface. Early results from preliminary surface sampling indicate zones with grades higher than 1.5% copper ("Waste Rock Project").

    · Jubilee's technical services team has commenced extensive resource definition and process technical review with the aim of completing the project implementation detail and timeline within the next 60 days.

    · Processing by Jubilee's newly developed modular copper units aims to produce in excess of 20 000 tonnes per annum of copper at a cost of below US$4 000 per tonne of copper from this historical waste rock dump.

    · Overall project costs including mining equipment and project infrastructure are likely to be around US$50 million.

    · Jubilee has the capability to construct and commission all modular copper units within a 12-month period and aims to commence within Q1 CY2024.

 
watchlist Created with Sketch. Add EM2 (ASX) to my watchlist
(20min delay)
Last
5.8¢
Change
0.004(7.41%)
Mkt cap ! $22.78M
Open High Low Value Volume
5.5¢ 5.8¢ 5.5¢ $10.95K 197.0K

Buyers (Bids)

No. Vol. Price($)
1 100000 5.4¢
 

Sellers (Offers)

Price($) Vol. No.
5.8¢ 9918 1
View Market Depth
Last trade - 16.10pm 14/06/2024 (20 minute delay) ?
Last
5.6¢
  Change
0.004 ( 3.70 %)
Open High Low Volume
5.5¢ 5.6¢ 5.4¢ 59023
Last updated 15.59pm 14/06/2024 ?
EM2 (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.