A small correction. Due to the delays which have now been...

  1. 713 Posts.
    A small correction. Due to the delays which have now been overcome. The earnings dates are lagging by some 6-12mths. Revenue creation commences around September this year. The 20 MW plant shall be installed immediatley apon completion of the 5 MW plant on the Gold Coast. Many of the facilities including foundations, control room, fuel storage etc etc shall be shared between the 2 plants on the one site, hence the additional plant construction time shall be minimised dramatically.
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.