"oops we stuffed up"
Results from the first six RC holes (for a total of 378 metres) drilled at the Area 1 Prospect were reported on 5
June 2007. The results reported by the Company on 5 June 2007 were incorrectly stated as U3O8 results when in
fact they were for uranium element values. The U3O8 results were therefore under-reported by approximately
17.9%. Revised results are reported at Annexure 1. Significant results include:
o 18m at 334 ppm U3O8 (including 5m at 648 ppm U3O8), from 2m to 20m.
o 13m at 302 ppm U3O8 (including 6m at 545 ppm U3O8), from 18m to 30m.
o 13m at 253 ppm U3O8 (including 7m at 344 ppm U3O8), from 26m to 39m.
"oops we stuffed up"Results from the first six RC holes (for a...
Add to My Watchlist
What is My Watchlist?