Guys,
Thinking this morning if 55,000 bbls of drilling fluids have to flow back and if this is completed in the next day or so then production of drilling fluids over 10 days is 229 bbls per day.
Drilling fluids are much heavier than oil so we can expect an initial oil flow rate of at least 229 boepd.
Any one else have any ideas.