MEU 0.00% 4.4¢ marmota limited

Estimated maiden JORC at Aura Tank, page-9

  1. 1,044 Posts.
    lightbulb Created with Sketch. 6351
    Mining, transport and toll treatment at the Challenger mill will cost us around 1g/t. So if we go this route good profits can be made from Aurora Tank ore if the head grade is 2 g/t or more. Once we get to sulphide ore I think it is possible/likely that this option will be required. I am expecting grades above 3 g/t so this should be quite profitable (6g/t +/- 2g/t my rough estimate). The oxide zone at Aurora Tank is heap leachable so it could be a few years before this option is required.

    Golf Bore can also produce 3 g/t head grade but the drilled zone should be heap leachable.

    I don't know the costs of current heap leach operations but it would not be hard to google or ask a metallurgist. Certainly all up costs would be considerably less than the 1 g/t I quoted for toll treatment at Challenger.
 
watchlist Created with Sketch. Add MEU (ASX) to my watchlist
(20min delay)
Last
4.4¢
Change
0.000(0.00%)
Mkt cap ! $47.80M
Open High Low Value Volume
4.4¢ 4.5¢ 4.4¢ $37.02K 831.7K

Buyers (Bids)

No. Vol. Price($)
2 453511 4.3¢
 

Sellers (Offers)

Price($) Vol. No.
4.4¢ 162267 1
View Market Depth
Last trade - 16.10pm 19/07/2024 (20 minute delay) ?
MEU (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.