2p for EOR
•Probable reserves are reserve estimates in known reservoirs which cannot yet be considered reasonably proved on the basis of current geologic and engineering information.
Comment
These volumes are expected to become proved as additional information becomes available, and it is important to be able to define the event which will allow the reserves to become proved.
SPE/WPC Reserve Definitions -Probable
•Typical Examples
–Down-spacing with questionable drainage patterns
–Market, contract limitations
–ENHANCED RECOVERY WITHOUT SUCCESSFUL TESTING
–Certain step-out development wells
–Work-over treatments without analogies
–Alternative performance interpretation
DATA NEEDED FOR ANALYSIS
•Need a good estimate of OOIP (STB) for both the analogy reservoir and the reservoir being studied.
•CO2 Flood Area OOIP (STB)
•Initial Oil Formation Volume Factor –Boi(RB/STB)
•Current Oil Formation Volume Factor –Bo (RB/STB)
•Current Reservoir Temperature and Pressure (ºF and psia)
•Carbon Dioxide Formation Volume Factor –Bco2 (RB/MCF)
•Initial and Residual Oil Saturation
•Historical production and injection rates
info from http://www.ryderscott.com/CO2-05-Slide-Stell.pdf.
- Forums
- ASX - By Stock
- estimated proved reserves and pilot plants
2p for EOR•Probable reserves are reserve estimates in known...
-
- There are more pages in this discussion • 12 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ELK (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
FHE
FRONTIER ENERGY LIMITED
Adam Kiley, CEO
Adam Kiley
CEO
SPONSORED BY The Market Online