I need to clarify this as assumptions of 4m3/t and 11m3/t are not correct.
The post I had made with the ucg gtl scoping study was predominantly made to outline the correct methodology the company would be applying to ascertaining the gas assets.
The maths behind it is quite simple:
a) With UCG 1 tonne coal = 20,000 scf therefore 20 GJ per tonne
c) In GTL, it takes 10,000 scf per bbl.
Hence 1 tonne = 2 bbls liquid.
Seeing only 50% of the coals are used in UCG, if you had 1 trillion tonnes, 500 billion is available for use.
500 billion tonnes coal x 20,000 scf = 500B x 20,000/10000 = 1 trillion bbl
In addition to this:
500 billion x 20,000 scf = 10 million petajoules or 10,000 exajoules.
- Forums
- ASX - By Stock
- estimates & reserve potential
I need to clarify this as assumptions of 4m3/t and 11m3/t are...
-
- There are more pages in this discussion • 26 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CTP (ASX) to my watchlist
|
|||||
Last
5.0¢ |
Change
-0.001(1.96%) |
Mkt cap ! $37.74M |
Open | High | Low | Value | Volume |
5.5¢ | 5.6¢ | 5.0¢ | $343.0K | 6.687M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 21770 | 4.8¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
5.0¢ | 15525 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 21770 | 0.048 |
1 | 288354 | 0.046 |
2 | 101303 | 0.045 |
1 | 9376 | 0.044 |
2 | 380000 | 0.042 |
Price($) | Vol. | No. |
---|---|---|
0.050 | 20700 | 1 |
0.053 | 57600 | 1 |
0.054 | 25490 | 1 |
0.056 | 409091 | 1 |
0.060 | 118000 | 2 |
Last trade - 15.29pm 19/06/2024 (20 minute delay) ? |
Featured News
CTP (ASX) Chart |
The Watchlist
INF
INFINITY LITHIUM CORPORATION LIMITED
Ryan Parkin, Managing Director & CEO
Ryan Parkin
Managing Director & CEO
Previous Video
Next Video
SPONSORED BY The Market Online