ESR 0.00% 1.4¢ estrella resources limited

Estrella Resources Share Cafe Webinar Presentation, page-4

  1. 26 Posts.
    lightbulb Created with Sketch. 9
    hey Penny if by dd's you mean drill rigs it all depends on the ground. Diamond drilling is the slowest form of drilling. You would think they will be running 2 shifts. Day 1 you will probably pull out 100 odd meters. Down at 600 meters you will probably be pulling 40. ta 50 for a 24 hour period. But in saying that I haven't been on a drill rig since 2003 so my memory is a bit slash a lot fazzy. Hope this helps
 
watchlist Created with Sketch. Add ESR (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.