ECT 0.00% 0.2¢ environmental clean technologies limited.

ets, page-11

  1. 2,232 Posts.
    Pas,

    " Victoria’s four major power plants are located in the valley and mine over 65 million tonnes of brown coal annually."

    1MTPA offtake = capex $122.4 mill (for 60% moisture) - Chairmans address page 16.

    2 tonnes brown coal = 1 tonne Coldry + 1 tonne water.

    So likely around 32mtpa Coldry is needed to power all four stations - with likely enough bi-product water to supply 100% of their needs.

    Therefore, to replace all four LV stations:

    32 x $122.4 mill = $3.9 Bill.

    Miniscule cost when you consider the various political, economic, and environmental benefits (inc WATER - enough bi-product to probably serve 100% of LV station needs).

    The boilers would have to be replaced too. Black coal boilers are about 20% cheaper than brown coal boilers. From memory - I worked it out at @ $5 Bill to replace all four stations boilers.

    So Coldry + boilers = @ $9-10 Bill - for state of the art stations. Problem solved. They just received another $4 Bill + the $3.3 Bill = $7.3 Bill....

    According to Milne yesterday - its a real possibility. Makes sense to us - surely it makes sense to the Govt !

    ESI is in play now - a real credibility boost today - the sp will follow soon.


    http://www.dpi.vic.gov.au/dpi/nrenmp.nsf/LinkView/80FA28AE49E0708ACA2574B9007985C88B3DA072DA032386CA2573DF001C56C6/$file/Victoria-CoalFuture_FactSheet.pdf
 
watchlist Created with Sketch. Add ECT (ASX) to my watchlist
(20min delay)
Last
0.2¢
Change
0.000(0.00%)
Mkt cap ! $6.343M
Open High Low Value Volume
0.2¢ 0.2¢ 0.2¢ $10.34K 5.173M

Buyers (Bids)

No. Vol. Price($)
2 3081503 0.2¢
 

Sellers (Offers)

Price($) Vol. No.
0.3¢ 14303561 22
View Market Depth
Last trade - 15.24pm 07/11/2024 (20 minute delay) ?
ECT (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.