Strateg1c8,
If you want to calculate a back of the envelope resource size (and thus market cap potential) do the following:
The combined strike length of the known vein systems (26,000) * metres ore body goes down dip (500) * vein width (0.7-1.5) * density (use 3.5-4 tonnes per m3), and
Then input cobalt, nickel, copper and silver %'s, multiple by today's prices (not even considering the explosion for non DRC Co and Ni demand upcoming) and when you recover from fainting, buy more EUC and thank the stars Tolga and this great management team found Dobsina and realised what it was - a world class asset.
Strateg1c8, If you want to calculate a back of the envelope...
Add to My Watchlist
What is My Watchlist?