A drill-stem test of the
Nullara Limestone produced 35.7? API (American
Petroleum Institute) oil at a rate of 144 kL/d
(905 bbl/d) through a 12.7 mm (1/2") choke. A drillstem
test of the Yellow Drum Formation produced
36.7? API oil at a rate of 5.7 kL/d (36 bbl/d). A total
of eight wells have now been drilled in the field, four
of which produced from the Nullara Limestone (1, 2,
3 and 5) and two from the Yellow Drum Formation
(4 and 6). The other two wells did not intersect
reservoirs. Blina 4 was subsequently re-completed
and produced from the Nullara Limestone. The
current operator of the field is Kimberley Oil NL.
suggested further reading
http://www.oilbasins.com.au/BlinaOilfield1.pdf
- Forums
- ASX - By Stock
- eureka
A drill-stem test of theNullara Limestone produced 35.7? API...
-
- There are more pages in this discussion • 3 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add EMP (ASX) to my watchlist
(20min delay)
|
|||||
Last
1.9¢ |
Change
0.000(0.00%) |
Mkt cap ! $8.602M |
Open | High | Low | Value | Volume |
2.0¢ | 2.0¢ | 1.9¢ | $7.195K | 369.3K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 1836232 | 1.9¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
2.1¢ | 29271 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 1836232 | 0.019 |
5 | 4014322 | 0.018 |
2 | 3000000 | 0.017 |
3 | 1189312 | 0.016 |
3 | 1707771 | 0.015 |
Price($) | Vol. | No. |
---|---|---|
0.021 | 29271 | 1 |
0.023 | 262094 | 1 |
0.024 | 200000 | 1 |
0.025 | 1110091 | 2 |
0.027 | 80000 | 1 |
Last trade - 16.10pm 16/10/2024 (20 minute delay) ? |
Featured News
EMP (ASX) Chart |
The Watchlist
JBY
JAMES BAY MINERALS LIMITED
Andrew Dornan, Executive Director
Andrew Dornan
Executive Director
Previous Video
Next Video
SPONSORED BY The Market Online