Should the second mine entrance work out, EL first needs all permits for production and a financing of almost 500 million....the longer EL waits, the higher the interest rate for the loans will probably rise with the current inflation and the production date will be postponed further and further back.
- Forums
- ASX - By Stock
- EUR
- EUROPEAN LITHIUM LIMITED
EUROPEAN LITHIUM LIMITED, page-2052
-
-
- There are more pages in this discussion • 2,918 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add EUR (ASX) to my watchlist
(20min delay)
|
|||||
Last
3.7¢ |
Change
0.000(0.00%) |
Mkt cap ! $51.73M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
EUR (ASX) Chart |
Day chart unavailable