My estimate is BMM and few Sophisticated Investors started dumping around Mind August once they smelled that size of Golden Swan estimate is too small and failure of any new DHEM plates. Even a toddler will not believe that it took 2 full months for a 3 weeks work (Resource Estimate). Delays means some thing fishy. That is for sure.
..
Analysis of the DHEM plates does not take even a week. Why POS dragged finding any new DHEM plate (failure) in Southern Terrace for 3 months. This gave some Sophisticated Investors enough time to dump their stocks before news got released. Since BMM controls the board hence they controls the info (I mean when it should be released). With out BMM permission, nothing moves inside POS. That is for sure.
..
While 2 drill rigs are at site, how the hell on earth they could not clear those clogged holes, it is beyond any one belief. Similar pattern happened when POS had a hole grouted. Info was only released after sitting on it for two months.
- Forums
- ASX - By Stock
- EV +$1.00 share in 15 months
My estimate is BMM and few Sophisticated Investors started...
-
- There are more pages in this discussion • 40 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add POS (ASX) to my watchlist
|
|||||
Last
0.4¢ |
Change
0.000(0.00%) |
Mkt cap ! $14.85M |
Open | High | Low | Value | Volume |
0.5¢ | 0.5¢ | 0.4¢ | $10.92K | 2.214M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
92 | 68826417 | 0.4¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.5¢ | 16787198 | 32 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
92 | 68826417 | 0.004 |
37 | 38392259 | 0.003 |
18 | 30550475 | 0.002 |
18 | 24600201 | 0.001 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.005 | 16787198 | 32 |
0.006 | 28597180 | 19 |
0.007 | 38440883 | 39 |
0.008 | 6829072 | 15 |
0.009 | 4338007 | 13 |
Last trade - 16.10pm 11/07/2024 (20 minute delay) ? |
Featured News
POS (ASX) Chart |