"Fluence Launches Next-Generation Battery Storage Product With 800MW of Orders
Fluence is launching the sixth generation of its integrated grid storage product and has already signed orders for 800 megawatts/2,300 megawatt-hours."
https://www.greentechmedia.com/articles/read/fluence-launches-next-generation-battery-storage-product-with-800mw-orders
That battery capacity equates to 30,667 Tesla model 3 long range.
- Forums
- ASX - By Stock
- AKE
- EV and battery thread
EV and battery thread, page-141
-
- There are more pages in this discussion • 2,448 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)