sonic, trans grid only manages NSW and ACT.
It is majority owned by a french canadian pension fund btw.
Most of it's lines are currently Cat 2 and Cat 3.
Humlink will be Cat 1 , IE: 500kv. Bloody massive
Many existing lines will need Cat upgrade to effectively distribute new generation including roof top solar into the grid.
Plus all the batteries, wind and solar farms need plugging in.
Then include SA, Vic and Qld. Same deal. But not by tg.
- Forums
- Political Debate
- EV propaganda
EV propaganda, page-160
-
- There are more pages in this discussion • 120 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Featured News
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non--Executive Director
Simon Kidston
Non--Executive Director
SPONSORED BY The Market Online