MEO 0.00% 0.0¢ meo australia limited

evans shoals progress update, page-6

  1. 1,857 Posts.
    lightbulb Created with Sketch. 103
    "Why wasn't a production test run 2008?."


    Simple...Because Blackwood-1 well was never designed to run a production test!


    Take a look at the Production Objectives in the following document and you will see why Ekey.

    http://www.meoaustralia.com.au/icms_docs/50470_Blackwood-1_Well_Weekly_Drilling_Report_-_No_2.pdf


    Production Objectives:

    In a success case, the full Plover Formation will be
    drilled to the interpreted structural spill point to confirm
    a gas-water-contact. While no production tests are
    planned for the Plover Formation, a full log suite will be
    acquired including image logs, rotary side-wall core
    samples obtained, and hydrocarbon samples and pore
    pressure data will be recovered by Modular Dynamics
    Testing (MDT) testing.
 
watchlist Created with Sketch. Add MEO (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.