EIO 3.57% 29.0¢ energio limited

With a 20% cut-off grade level they have come up with 488Mt at a...

  1. 5,719 Posts.
    lightbulb Created with Sketch. 319
    With a 20% cut-off grade level they have come up with 488Mt at a 43% grade (which is about 15% of this one prospective lease area).

    Section B alone has 347Mt at 46%. To put that in perspective, AKI (another Ian Burston success) had a total of 121Mt at 46% and was taken-over by Exxaro for $338m (for its 92% stake) earlier this year.

    AKI had access to a 10Mt p/a rail line, EIO have an under-utilized heavy duty line with 20Mt+ p/a capacity, requiring a 60km spur line to the deposit.

    The ore will need a simple benefication process to get to a 58% minimum. I believe it is the same WHIMS circuit process (Wet High Intensity Magnetic Separation) that Joe Ariti is overseeing with CFE's Marampa project (but who's grade is low 30%'s).

    Once the prelim metallurgy is proven next month we should be on our way to a $200m market cap very quickly in my opinion.
 
watchlist Created with Sketch. Add EIO (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.