Yeah but that is the formality of procedure.
We would love to know the condition of the 2 slabs,as of now.
Remember I20 was poured on a very wet base,but maybe is has cracked and they dont want to talk about it.
And maybe the laydown yard trucks fell through the Ede replaced slab!
AAHH I am going nuts waiting. ( Nutier)
- Forums
- ASX - By Stock
- EDE
- Example of slowness of change
Example of slowness of change, page-49
Featured News
Add EDE (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.2¢ |
Change
0.000(0.00%) |
Mkt cap ! $8.216M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
EDE (ASX) Chart |
Day chart unavailable