HRR heron resources limited

RESOURCE ESTIMATE FORAUBILS NICKEL LATERITE DEPOSITSUMMARY.. An...

  1. 5,851 Posts.
    lightbulb Created with Sketch. 711
    RESOURCE ESTIMATE FOR
    AUBILS NICKEL LATERITE DEPOSIT
    SUMMARY
    .. An Inferred Mineral Resource of 43.8 Mt grading 0.78% nickel at a 0.50% nickel cut-off has been
    estimated for Heron’s Aubils nickel laterite deposit.
    .. The Aubils deposit is respectively 30km and 60km north of the other two Yerilla Project deposits,
    Boyce Creek and Jump-up Dam. Aubils will be included in Heron’s Scoping Study evaluation of the
    Yerilla Project using beneficiation and atmospheric leaching.
    .. The total JORC compliant resource at the three Yerilla Project deposits (Jump-up Dam, Boyce Creek,
    and Aubils) now stands at 135.4Mt grading 0.77% nickel at 0.50% nickel cut off (see below table for
    JORC category delineation).
    Heron Resources Limited (ASX: HRR) (Heron) is pleased to announce the completion of a mineral resource estimate on its
    100% owned Aubils nickel laterite deposit. Aubils is located approximately 200 kilometres northeast of Kalgoorlie
    (Figure 1). An Inferred Mineral Resource of 43.8 Mt grading 0.78% nickel at a 0.5% nickel cut off has been estimated in
    accordance with the JORC Code (JORC 2004).
    Estimated by Heron Resources from mostly recent Heron drilling data, the mineral resource is based on 323 reverse
    circulation (RC) drill holes for 18,650 metres of drilling at hole spacings ranging from 80 metres east by 160 metres north to
    160 metres east by 320 metres north.
    Heron’s Managing Director, Mr Longworth, said that the Company is very pleased with this initial resource estimate for the
    Aubils project.
    “Heron’s total Yerilla resource now well surpasses the 100 million tonne mark. This is a significant milestone for the company
    especially in combination with the resource in the Company’s Kalgoorlie Nickel Project.” said Mr Longworth.
    “These resources give the Company confidence for the expanded Yerilla Project Scoping Study currently underway which is
    evaluating the production of 20,000 tpa of nickel in intermediate product.”
    Estimation Methodology
    The resource was estimated by ordinary kriging into 80mE by 80mN by 4mRL size panels. Uniform conditioning (UC) was
    subsequently carried out for nickel using selective mining unit (SMU) dimensions of 10mE by 10mN by 4mRL. This was
    done in order to produce an estimate of the tonnage and grade recoverable by selective mining once close spaced drilling
    (grade control) is carried out during future mining. Both the ordinary kriged parent block estimate and the uniform
    conditioning selective mining unit estimate have been classified as Inferred Mineral Resources in accordance with the JORC
    Code (JORC 2004). They are reported below for 0.50%, 0.70%, 0.75%, and 1.00% nickel block cut off grades:
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.