SYR 1.11% 22.3¢ syrah resources limited

Excellent timing for commissioning ?, page-6

  1. 2,426 Posts.
    lightbulb Created with Sketch. 504
    Mega Factories State of Play 2017-2021

    Assuming a very conservative 250 GWh by 2021 that translates to :

    Spherical Graphite annual demand (1kg per KWh assumption) : 250.000tpa
    (at 50% yield of spheronization that is 500.000tpa of flake graphite)

    Lithium annual demand (0.65kg per KWh assumption) : 162.500tpa

    Cobalt annual demand (0.1kg per KWh assumption) :  25.000tpa



    Simon Moores‏ @sdmoores 13 oct.
    20 lithium ion battery megafactories in the pipeline. As tracked by @benchmarkmin the leaders in battery supply chain Intel

 
watchlist Created with Sketch. Add SYR (ASX) to my watchlist
(20min delay)
Last
22.3¢
Change
-0.003(1.11%)
Mkt cap ! $227.6M
Open High Low Value Volume
23.0¢ 23.0¢ 22.0¢ $304.0K 1.353M

Buyers (Bids)

No. Vol. Price($)
44 895597 22.0¢
 

Sellers (Offers)

Price($) Vol. No.
22.5¢ 484627 27
View Market Depth
Last trade - 11.08am 15/08/2024 (20 minute delay) ?
SYR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.