KP2 1.75% 5.6¢ kore potash plc

Mate i know they are due by the end of the quarter i have said...

  1. 360 Posts.
    lightbulb Created with Sketch. 42
    Mate i know they are due by the end of the quarter i have said this previously.....but and there is always a BUT when things are left to the last day of the quarter generally this means there will be a statement saying along the lines of been a delay and we will provide the report in Q2....

    if this is the case i expect there will be a bit of a depression in the price. I hope i am wrong but leaving it to the last day is never a good sign for an important report as is the optimisation study
 
watchlist Created with Sketch. Add KP2 (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.