Based on previous release (1 Sep 2020) assuming that they change over from RC drilling to diamond drilling at the 400-450m level, they should now be doing DD at 60-70m per day (based on 2 shifts).
As drilling commenced on HWDD006 on 27 May 2022, after 12 days of drilling they should be at a downhole depth of approximately 900 to 1,000m.
We are at (or close to) the projected basement level of INTEREST.
GLTAH
- Forums
- ASX - By Stock
- EXCITING TIMES - Horse Well prospect
Based on previous release (1 Sep 2020) assuming that they change...
- There are more pages in this discussion • 15 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CHK (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.4¢ |
Change
0.001(33.3%) |
Mkt cap ! $14.35M |
Open | High | Low | Value | Volume |
0.4¢ | 0.4¢ | 0.4¢ | $23.18K | 5.795M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
9 | 83571074 | 0.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.4¢ | 11279994 | 19 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
8 | 83238074 | 0.003 |
29 | 50980693 | 0.002 |
26 | 59041798 | 0.001 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.004 | 11279994 | 19 |
0.005 | 10342503 | 10 |
0.006 | 1312154 | 6 |
0.007 | 1875909 | 2 |
0.008 | 1453545 | 2 |
Last trade - 10.02am 07/05/2024 (20 minute delay) ? |
|
|||||
Last
0.4¢ |
  |
Change
0.001 ( 33.3 %) |
|||
Open | High | Low | Volume | ||
0.4¢ | 0.4¢ | 0.4¢ | 1375000 | ||
Last updated 11.41am 07/05/2024 ? |
Featured News
CHK (ASX) Chart |
The Watchlist
I88
INFINI RESOURCES LIMITED
Charles Armstrong, CEO
Charles Armstrong
CEO
Previous Video
Next Video
SPONSORED BY The Market Online