Yeah, sort of factor. The assumption is in relation to creating the junction within the overhead HV corridor eg: Pole upgrade or bracing / machinery / whs, who owns the corridor.
It is brazil however and just posing the thought.
Semantics maybe.
AVB Price at posting:
9.0¢ Sentiment: None Disclosure: Held